Bimbling on Derwentwater


Mary paddling Geyrfugl on Derwentwater

A day with both wooden boats (Mary in Geyrfugl, myself in the Cormorant) and Michael paddling Mary’s Romany LV.


Geyrfugl and Piqqalujamik takujumavunga on the island

Sunshine and calm water made for a pleasant trip just out to the island for a brief picnic, and some scenic photos of the boats with Cat Bells in the background.


Geyrfugl compared with an NDK Romany

The last photo shows what a long waterline length Geyrfugl has compared with a more traditional Greenland-derived boat. The Romany is a good half metre longer overall, but has a shorter waterline. With its narrower beam and rounded hull, this makes Geyrfugl a very fast boat, and easily stable enough to handle conditions like these. She is not so good when it gets rougher, however !

Conwy ascent

We were in too mixed a bunch of kayaks to compete in the race – Doug in his white water boat, myself in the new Cormorant and Heather (a couple of years older than Sarah) paddling Geyrfugl. Those not racing get a somewhat later start, so the channel is that bit deeper and wider and the line less critical. We did find that cutting corners led us into slower water, so those who know exactly where the deepest point of the channel is must have a distinct advantage in the race. We were going quite fast enough, thank-you – we were hardly paddling at all as the tide carried us under the bridge (though some steering was very necessary to avoid being smeared onto the bows of moored boats) at a speed of 7 knots by the GPS.


Heather paddling Geyrfugl about halfway up the river – the tide was not going particularly fast by this stage

Sunart to Lochaline

On Saturday morning we made our way along the south shore of Loch Sunart until, a short way on the minor dead-end road, we found a suitable beach and parking spot. Here we packed the boats and shuttled cars to the Lochaline ferry terminal where we parked them out of the way. We were still off fairly early, and paddled west toward the Sound of Mull. It was dry while we were packing up, but did look a little threatening.


Packing boats on the shore at Loch Sunart

Although the road soon ends on the south side of the Loch and it seems quite remote, there are a lot of fish farms to skirt round, and some brief bits of current at the narrows. It felt cooler after our lunch stop with heavy showers.


A rocky and seaweedy lunch stop on the south side of Loch Sunart

Down the Loch, we turned down the side of Carna and headed against the quite strong tide into Loch Teacuis (a bit of eddy-hopping here) to look for a campsite. All that’s needed is a small patch of ground that’s neither rock nor bog and is above the high tide, but this was not as easy as you’d think, as this area is both rocky and wooded! We eventually cut back towards Loch Sunart on the other side of Carna, and found a spot on a little island between Oronsay and Carna.

The rain started in earnest as we put our tents up. Pete and Wendy’s tarp rigged as a shelter gave us some respite from the weather whilst we were cooking, but we gave up the social scene a bit earlier than usual and scurried off to our tents.


Camp in the rain between Oronsay and Carna

Morning brought an end to the continuous rain, just the odd shower, but these could be quite squally at times, and even in the bright intervals, it was at least breezy leading to rather more challenging sea conditions. Anna had already decided that we would stick to the east shore of the Sound rather than crossing to Tobermory. We stopped for a break on a little shingle beach at Auliston Point, as everyone was a bit chilly. Firstly you get warm by looking for wood, then try to figure out how to get it to burn. By the time we were ready to resume, Andy and Clive had a nice little fire going, and it seemed a shame to leave.

Heading south into the Sound of Mull, Claire was keeping close inshore – did she know something we didn’t? Suddenly she was pointing madly at something in the water, an Otter crunching on a fish, right in front of her boat. Later we all watched a pair of Otters playing and feeding only feet away from us.

We needed to get far enough down the Sound to get a bit of shelter from Mull itself and be within an easy day’s paddle of the cars, but didn’t want to be so far that we were next to the road. There aren’t many beaches, and we found an awkward landing but a raised grassy site with bluebells and primroses. Nearby was a wood to gather fuel, and an interesting old ruined chapel to go exploring. Nick lit the fire after we had eaten and in the conditions, a small one didn’t seem appropriate. A decent bonfire warmed us through (and a bit more running around for more wood did no harm) some managed to get gear dry, if a little smoky. There were still some sharp squalls, but a good sunset and a couple of fantastic rainbows over the islands in the sound.

Intermittent heavy showers in the sunset gave us good rainbowsOn Bank holiday Monday, the wind was from the West imposing a short chop on the swell running down the Sound almost with us. This made it made it tricky to hold our Southerly course but those who were comfortable in the conditions were soon catching waves to surf. We watched one of the ferries to the Outer Hebrides go past and thought no more of it for a while, keeping fairly close inshore. After what seemed a long time, the wake arrived, giving us quite a big beam sea as the waves steepened in the shallow water. Sunshine and showers over dark hills and reflecting waves always makes for a dramatic scene to paddle through and in quite a short time we were at the ferry terminal at Lochaline, shuttling for the remaining car from Loch Sunart and on our way home.

Bute at Easter

The new sea boat was almost finished, and I’d had a few paddles on Derwentwater, Lake Bala and Ullswater. What I needed now was a proper maiden voyage at sea – and since she was built as a dayboat, a nice day trip in a calm sea would be ideal. But the next opportunity was Easter, and a four-day trip was planned. Could I fit in gear for that long, and was it sensible to commit to a four day trip on a maiden voyage ? Well, the forecast didn’t look bad, so Piqqalujamik takujumavunga went on the roof and off up to Largs.

I’d not been in the town five minutes, getting chips, when I was accosted by a Scottish gentleman enquiring about the boat and its Inuit name. The conversation was brief (my chips were going cold !) and as he departed he handed me his card – no less than Duncan Winning OBE, Honorary President of both the SCA and the Historic Canoe and Kayak Association. Wooden boats are certainly a way to get noticed !

Soon, Dave West turned up, followed by Johnny, Jenny and Alison, then Clive, Wendy and Richard. We noticed that the wind was perhaps a little stronger than we had expected. In fact, when we went down to the Yacht Haven it was quite a lot stronger. So we went for a beer…

A little calmer on Friday morning, so after a hearty breakfast during which Gareth arrived, we put on and headed out into the Clyde, noting such scenic highlights as Hunterston Coal terminal. The new boat is narrower than my North Shore boat, though not as narrow as my first wooden boat, and I noticed that paddling down the Fairlie Roads was perhaps not exactly “relaxing”. But we were soon paddling alongside Great Cumbrae in sunshine and flat calm (“It’s always like this!”)

Paddling quickly against the swirling tide around Farland Point, those used to the quietude of Scottish Islands were surprised by the bustling town of Millport, at which we did not stop, but headed out past Portachur Point and into the main channel of the Clyde for the two mile crossing to Bute. Now the wind was NNE, the tide was coming up the Clyde and we were heading SW – with wind against tide in a quartering sea it was getting a little choppy in the middle. But I was starting to get used to the boat and just as I began to relax a little, someone stole my sky ! Either that or it was raining unbelievably heavily, even for Scotland.

Concluding that I was upside down in the sea and that I ought to do something about it, a roll seemed in order. First go got nowhere near, but the second try got me a breath. At this point it occurred to me that I had a really nice tight-fitting boat with a tiny “Ocean” style cockpit, and that if I was going to wet exit, perhaps I should do so before I got really short of breath, in case it turned out to be a struggle (no, I hadn’t rehearsed this manoeuvre in this boat – oops!). However, gravity and buoyancy work wonders and in no time flat I was swimming. Swimming a kilometre from Bute in a choppy sea, but nonetheless, with my head above water.

Needless to say, SOC came rapidly for the opportunity to practice their rescue skills and soon had me in the conventional upright-inside-boat position. Pumping out was a little entertaining, but, once done, paddling resumed, and I didn’t hang about (an April swim in T-shirt and shorts is very bracing !). Minutes later we landed in Glencallum Bay for a brew – and up popped a submarine just offshore, apparently wondering about the little white upside down face they had just seen through their window 🙂

Glencallum Bay - warming up. Photo: Andy Waddington.
Glencallum Bay – warming up

The west of Bute proved more sheltered and we made our merry way to Inchmarnock, where a campsite was found at the very north end. A wander down the length of the island was punctuated by a mainly psychological encounter with a Heeland Bull – who was only just less frightened than Westie, who retreated at this point while the rest of us took to the delightfully flowery woodland to avoid causing permanent trauma to the bull. We failed to find the Bronze age tomb with its skeleton covered by a pane of glass (which, it later transpired, was right next to where we were camping) and for some time failed to recognise the chapel until we realised that all its stones had been half-inched to build the farm, and the blue plastic sheet marking an archaeological dig was all that was left.

Camp on Inchmarnock. Photo: Andy Waddington.
Camp on Inchmarnock

Saturday saw us crossing to a lunch stop on Bute where some visited a chambered cairn while others stuffed themselves on pancakes. Three miles further on, we rounded the western tip of the island to re-encounter a stiff wind. Whilst some crossed the channel with a view to visiting Eilean Dubh, a majority vetoed this idea in favour of hugging the shore in the lee of Bute, so we all regrouped at Buttock Point to paddle into the teeth of a by-now-quite-strong easterly past the Burnt Islands and on to the Kyles of Bute where we got off.

Waiting out the wind near the Bute ferry. Photo: Andy Waddington.
Waiting out the wind near the Bute ferry

White horses capped the waves as far as the eye could see, and no-one fancied trying to cross the quarter mile to the other side, so we hung about for a few hours to see if it might improve. We still had two days and there was always the option of a ferry if things stayed rough. However, by five O’clock the wind was easing and we set off, trying to time things so as to avoid the wake from the frequent crossings of the Kyles of Bute ferry. This was rather spoiled by Gareth sat casually in front of the slipway as the ferry approached, taking a call on his mobile phone !

Grabbing what shelter we could from the little bluffs on the Cowal shore, we headed at a reasonable rate down the Kyles. Tactical discussion at Strone Point decided us to cross Loch Striven, heading to the south of the ugly NATO fuel jetty to the shore at Port Lamont. Here, at dusk, we found a passable place to camp by an old yard, and just after pitching, were greeted by the night watchman and his dog, who informed us we were on private property. However, given that our only transport was the kayaks, and it was now on the verge of darkness, he hadn’t the heart to chuck us off.

Just time to collect driftwood (and, in Alison’s case, some impressive bruised knees) and start a fire. I found a nice steel-tube wooden-slatted chair (“fell off the back off a ferry, guv’nor!”) to recline next to this, from which I was entertained to watch a gust of wind produce a shower of sparks, at which the four in a row sat neatly on a large log all fell rapidly backwards – luckily no drink was spilt !

Sunday morning and a forecast for increasing winds by Monday was a good reason to cut and run across the Clyde for Largs. It was sheltered enough rounding Ardyne Point past more derelict yards and a pleasant view across to Rothesay. Toward Point was the starting point for the five mile diagonal crossing of the Clyde. The wind strengthened and there was quite a chop at first, but as we left the land behind, the gusts waned and the waves became more like a short swell. Our timing was good to avoid the worst of the wake from the Wemyss Bay ferry and my confidence returned as we passed the mid point steadily heading for Knock Castle and calmer water in the lee of the mainland.

A lunch stop ensured we were relaxed for the final leg down the coast back to Largs Yacht Haven, but we were hit by quite a strong squall crossing Largs Bay – it’s not over until the boat’s on the roof of the car ! Once that was achieved, we had a “proper” lunch, then a wander round the chandlers’ to cat calls of “Don’t sell him any gadgets!” They hadn’t got any self-righting gadgets for kayaks (you’re supposed to do that yourself), so they didn’t.

Piqqalujamik takujumavunga – maiden voyages

Lake Bala 2003-04-13. Photo: Sue Sharman

The maiden voyage was 2003-04-09, on Ullswater, when I did a 7½ mile paddle in flat calm conditions. I managed 7.4 km/h average, coincidentally exactly the same speed as I had paddled Geyrfugl over a very similar course last October in quite choppy conditions. I paddled the Cormorant early season when less paddling fit, and using smaller Kinetic Touring blades, rather than the Nordkapp blades I had used in October, but formed the impression that the new boat was a little more sluggish, much as I expected from a hard chined boat of greater design displacement.

Lake Bala 2003-04-13. Photo: Sue Sharman

A couple of shorter paddles at the weekend after opening the skeg slot suggested that the boat produced significantly more wake than Geyrfugl when paddled hard, so the wave-making drag experienced at higher speeds does seem to be greater. However, with another paddler for a pace comparison, I didn’t paddle quite so hard, and the boat is very easy to drive at cruising speeds. She also tracks amazingly well – much better than I had expected – this is the only boat I have ever paddled where you can simply stop paddling and the boat will continue on a straight course. She responds well to a lean and carves a turn well at speed, but is quite an effort to spin when stationary – I had expected her to be a little more manouevrable at low speeds.

Lake Bala 2003-04-13

When stationary, she seems to be fairly wind-neutral, but weathercocks slightly when being paddled. The weathercocking is most noticeable in a quartering sea, and she wanted to broach when we were overtaken by a squall on Lake Bala. When the drop skeg is fitted, this should be exactly what is needed to counteract this effect, and enable me to continue putting all my effort into forward paddling. This is just as well, since at 52 cm overall beam, she feels quite tippy when stopped or slow moving in choppy water. A sea trial will be needed to see how she handles in a swell, which may be bigger, but should be less steep. Having a bigger displacement than Geyrfugl, and a more pronounced sheer, it is no surprise to find the bows ride higher and a much drier ride results. With the boat empty of equipment, and no split paddle on the aft deck, the trim is perhaps slightly bow heavy. A trial pack shows that I can readily get gear for a long weekend into the boat, though she would be expected to ride a little low in the water with me paddling – the design displacement makes her about right as a day boat for me, or a tripping boat for lighter members of the family.

An eight mile paddle on Derwent Water 2003-04-15 with the skeg fitted, and quite a lot of gear stowed (but not a full weekend’s camping load) was revealing. With a bit of breeze (but no squalls) and some reasonable waves, the boat doesn’t track quite as solidly as she did at the weekend, but dropping the skeg seems to counteract the broaching pretty well. Using Nordkapp blades, I managed to circumnavigate the lake at an average of 7.6 km/h, but this paddle involved quite a lot of very shallow water, where the boat really slows down, so that figure is undoubtedly an underestimate of the pace I could maintain in open water. Over one section, I managed to maintain over 9 km/h for quite a way as I worked to overhaul a motor boat (he was limited by the lake’s speed limit) – and this was directly into the force two to three headwind. With the load, the ride was a little wetter, but the stability was quite reassuring.

Cormorant essentially finished !

With the last bits of glass applied to the internal bulkheads, Piqqalujamik takujumavunga is basically complete and seaworthy. The skeg slot is still glassed over and skeg not yet fitted, and the boat will need varnishing, but these jobs can be deferred for a while. From first laying out the marine ply to scarf boards together for the hull, to paddleability, has taken four and a half months (275 hours of actual work on the project so far – not counting time spent on shopping trips).


The boat (and Geyrfugl) two days ago – without deck lines and bulkheads not fully installed.

More photos in a few moments…

Retractable skeg

My first wooden kayak, Geyrfugl, has shown a definite tendency to be blown off course when paddled by its intended paddler, who is very light, leading to a lot of windage and not much boat in the water. She is fine with a heavier paddler (and would probably be OK with a lot of cargo, too). My second boat was also being built as a low volume kayak, and whilst I intended to paddle her, it also seemed likely that smaller members of the family would get to use her at sometime. Since almost all of the typical “British sea kayak” designs come with a skeg, and I had a lot of (positive) experience using one, I decided to build a skeg for my Hybrid Cormorant. In fact, during her maiden paddle, before the skeg was fitted in its slot, the boat proved to be very strongly tracking, and I began to wonder if I had wasted a lot of time and effort on this part of the construction. However, using the boat in bigger waves and windy conditions, and especially when paddling downwind or surfing, has shown the skeg to be a valuable addition.

There are a number of possible skeg configurations out there, such as the one sold by Chesapeake Light Craft for their kits. British boats tend to have either the NDK style of skeg (which is pulled up by a string and cleat arrangement opposing a bungie-cord which tries to deploy the skeg) or the type fitted by Valley Canoe Products, North Shore and others, which is controlled by a stainless steel cable running in a small diameter nylon tube. I’ve never liked the NDK style, and the CLC style involves a big deck penetration which I don’t like, as much of the work must be done after the deck is attached to the hull.


Skeg deployed

I went for a skeg very similar to the one I already use which is fitted to my North Shore Mistral boat, operated by a slider control next to the cockpit, and dropping down as a triangular shape near the stern.


Skeg box with skeg (outline yellow), pivot cut out (red) and slot for wire (blue)

The skeg box was made from two pieces of 4mm plywood (glassed both sides with 4 oz glass), spaced apart by 6mm ply strips. The skeg blade was also 4mm ply, again glassed both sides. The thickened epoxy used to assemble the box added a little extra spacing, so that the skeg blade has maybe half a millimetre clearance each side within the skeg box. This is a lot less than the clearance seen in commercial skeg designs, and I hoped that my careful assembly would ensure that this was not a problem. Keeping the clearance low would mean that there was little space for water to circulate when the skeg was up, which would avoid creating a lot of turbulence and drag.


The stainless steel insert for the skeg pivot point

The pivot would be a piece of stainless steel bar cut off from a chunk I found lying around – this is quite a large (12 mm) diameter so that the radius of the cutout in the skeg blade should not produce too much stress concentration as would be expected with a small diameter pivot. The bar was cut 14 mm long, so that it would penetrate both skeg box walls, but be covered by glass and epoxy at the sides.


Skeg box view up inside


The skeg slot, initial cut


Skeg box fitted inside hull

The slot for the skeg box was cut in the keel of the hull after the inside was glassed and the box itself had been assembled. This was quite scary since the cuts must be made at a steep angle to the surface of the hull, keeping the saw blade vertical. I cut the slot undersized and then sanded it out to size using coarse grit paper wrapped round a small piece of wood. This produced a very thin edge, prone to splintering, but as this would later be covered by glass and epoxy (and inevitably some fairing compound), I did not foresee a problem. The box was fitted with a few blobs of hot melt glue, and held in the centre of the boat by a temporary brace.


Skeg slot taped over

With the skeg box temporarily fixed in position, I taped over the outside to stop epoxy running down, then poured a runny mix of epoxy and micro-balloons into the groove either side of the box inside the hull. This epoxy mix flowed nicely into the sides of the box and formed a good fillet in the tight V-shapes each side.


Skeg box fitted inside hull


Skeg box top edge taping

The top edge of the skeg box had been epoxy sealed, but now needed a layer of glass to protect it. This was easier to do after the box was in place, and was achieved by wetting out a piece of one inch tape, covering it in a plastic film and clamping it so that the tape wrapped down the sides of the box (the poor man’s vacuum bagging approach:). The edges of the skeg box which stood proud at the keel were then sanded fair with the hull, and any gaps where the runny epoxy mix had not filled from inside the hull were filled with a thicker fairing mix. When the outside of the hull was glassed, the open skeg slot was simply glassed right over with both layers of glass (and was not actually cut open again until after the first launch).


Shaping the skeg control slot

With the skeg box fitted, work could now shift to completing the hull glassing and building the deck, which, being stripped, was a much longer process than building the hull. In parallel with the deck stripping, I made the components for the sliding hand control. First, I cut a square piece of sycamore from a straight branch fallen from one of our own trees. I then routed a deep groove into the centre of this, and sanded the bottom out by using sand paper wrapped round a piece of dowel.


The skeg slider in its channel before epoxing

Then with this piece in the vice, I used a block plane to take down the corners to produce a piece of channel with a side thickness slightly more than that of the deck strips. I sealed both surfaces with epoxy, but decided that glassing the inside was going to be too difficult. This was an error – the epoxy sealing was not sufficient and I now have to remember to varnish the inside of this channel rather frequently on the finished boat. The actual slider was cut from a piece of walnut (which didn’t turn out as dark as I had hoped). There are two holes drilled in this along the axis of the control. One is to fit on a thin stainless steel rod to keep the slider in place, the other contains a brass cable clamp which locks onto the control cable via two small screws which are accessed by two more small holes drilled in the top of the slider.


Fitting the skeg control recess

The ends of the slider recess were filled in with marine ply, also drilled with holes to take the stainless steel bar and the control tube. A hole was cut in the deck (after glassing both sides) slightly smaller than the inside of the assembled recess. This was sanded to remove all sharp corners and epoxy sealed. The recess was then glued to the inside of the deck with thickened epoxy made into a fillet, which was then covered with glass tape. After a certain amount of sanding off projecting bits of glass fibre and a further epoxy fill coat (the control would be quite near my knee inside the boat, so I wanted a good finish), the remaining assembly would wait until after the deck had been fixed to the hull (and indeed, until after the maiden voyage).


The skeg control as fitted to the boat – I chose to fit this left of the cockpit

After the kayak was basically seaworthy, with hull and deck assembled, cockpit complete and bulkheads and hatches installed, the final job was to install the control tube and slider control, then cut open the outside of the skeg slot and fit the skeg blade, which had meanwhile been attached to a length of stiff 4mm stainless steel wire obtained from my local boat chandlers. The control tube itself is a standard VCP skeg control tube obtained from my local sea kayak shop. First I had to drill out a suitable sized hole in the top of the skeg box – there was a gap in the filler strip for this, so all I actually had to do was cut out a small amount of the glass tape. Getting at the skeg box was easy, since I had built in a small Kajak Sport hatch far aft above the skeg box to provide access to this part of the cargo space – this makes loading and unloading the kayak through the aft bulkhead hatch a lot easier and avoids losing small items permanently behind the skeg box ! Drilling a hole in the aft bulkhead was a little more awkward, since I wanted the hole as close as possible to the hull, but didn’t want to accidentally damage the glassing on the inside of the hull. The tube was then fed through this hole, along the inside of the sheer, and down into the skeg box, held in place along the inside of the hull by a few blobs of holt-melt.


The skeg control tube fitted and epoxied into the skeg box

The tube was carefully cut to length and the other end inserted into the hole in the slider recess. At this point, the stainless steel guide rod was also inserted into the end of the recess, threaded onto the slider knob, and passed through the other end of the recess, where a second piece of tube was also added, to allow room for the end of the control wire to move. The rod and both pieces of tube were then fixed in place with thickened epoxy, being careful to seal all the drilled holes and the end of the short tube. I had also epoxied over the end of the control wire to be sure that it would neither fray in use, nor scratch the inside of the tube as it was fed through. The end of the wire was fed into the skeg box, carefully inserted into the tube and pushed until it popped out in the slider recess. It was then fed through the cable clamp in the slider knob, and fed into the other piece of tube. At the appropriate point as the amount of spare cable at the skeg end disappeared, the skeg blade was hooked over its pivot so that when the cable was completely absorbed into the boat, the skeg was in the retracted position. The position of the slider knob was adjusted and the cable clamp tightened. The position of the slider knob was chosen so that when pushed as far aft as the recess allows, the top edge of the skeg is still just within the box, so that the skeg is not too vulnerable to breakage if it is caught a sideways blow on a rock.

Problems – well, there were bound to be one or two. Firstly, the slider knob is just too tight a fit on the thin stainless steel rod which guides it along the slider recess. This makes it a bit prone to jamming, requiring a bit more care to operate than ideal. Given how the thing was put together, fixing this is difficult, but I have lived with it for a season and reckon I can live with it permanently, or at least until the control has to be dismantled for some other maintenance job… But in fact, over the ten years since the initial build, this has loosened off and has never been a problem in actual use.


Skeg box edge damage – needed a much tougher finish

Secondly, the narrowness of the skeg box was continued right to the hull of the boat, and this made it extremely prone to getting jammed by sand on beach launches. I tended to test the skeg as soon as I had got through any surf, but this then meant a surf landing and another launch from sand to fix it. In the course of unjamming the skeg several times, using a borrowed knife, I damaged the edge of the skeg box. The rather thin edges also took damage from my rock-hopping games when the skeg was up, to the point where bare wood was exposed. Obviously this needed urgent repair. I sanded the edges down to a much more rounded outline with a lower profile than the rest of the keel. I also sanded out the inside of the skeg box near the keel, so that the


The skeg retrieval loop

internal shape was somewhat flared. I then added glass tape to both sides of the slot, standing proud above the wooden edge, and filled the angle between the wood and the edge of the glass tape with thickened epoxy. I also drilled out two holes into the lower edge of the skeg itself, and inserted a bent piece of stainless steel rod to form a small loop into which can be inserted a piece of wire or similar to get a grip on the skeg and pull it down if jammed. As it happens, the changes to the shape of the skeg slot have meant that jamming has been far less frequent since making these repairs.


The skeg retracted – after slot repair

With the skeg retracted, the keel profile is not now quite so smooth, but the skeg jams much less readily, can be unjammed easily, and there is still no great open slot to cause turbulence and drag, so this is basically the shape I would aim for in building another skeg system.

Since building this skeg, I have seen one or two other boats that illustrate a bit of lateral thinking. The purpose of a skeg is to increase the lateral resistance of the stern to sideways (fishtail) movement. But there is no real reason why the skeg has to be exactly on the keel line. It is possible to put the skeg box off to one side, so that the skeg emerges from part of the hull that does not drag in the sand on beach launches. At least one commercial design uses this offset-skeg idea and it seems to be quite successful. It’s definitely something I will try on the next boat, and should, as an extra bonus, make the far aft cargo space more usable. I will aim, with that design, to make the outer rim of the skeg slot of a hardwood (indeed, probably simply substitute two or three sections of strip with hardwood ones during construction, then cut the slot through those).

Stripping the deck

As published by Squeedunk Kayak, the Cormorant is built stitch and glue for both the hull and deck. My plan was to combine the speed of stitch and glue for the hull with the attractive appearance and flexibility of design of stripping for the deck. Accordingly, I took the offsets for the published design to get the centreline deck heights and beam, then printed out half-ellipses to the relevant sizes to make forms for stripping. The foredeck being higher, had “fatter” half ellipse sections. Apart from defining the cross-sections, the major design issue for a strip deck was the pattern and the materials to use to realise that. I had a huge amount of 5/8″ Western Red Cedar boards to cut into strips and quite a lot of what my timber supplier calls Redwood (which is actually plantation-grown Scots pine from Scandinavia). I also had some American Yellow pine which has a nice grain, and various bits of spruce. These are all pretty good, easily workable lightweight softwoods, the sort of thing one would normally expect to use for a strip boat. However, I wanted something contrastingly dark, and for this I picked Brazilian Purpleheart, which really is an impressive purple colour when freshly cut, but which darkens considerably on exposure to light. I had worked on a number of ideas for stripping patterns, of which these two were the ones I’d come down to a decision between:


A choice between a plain deck with a feature strip, or a much bolder sweeping design

I had eventually decided on the second design, realised with the Redwood Pine (lightest), Red Cedar (mid-brown) and Purpleheart (darkest). Initially, progress was quite fast since a fairly large area could be filled in with the lighter woods. The purpleheart had come in thicker boards, making for wider strips, but where there was a lot of curve to accomodate, I split these into two narrower strips. In this first photo, I am stripping pine from the bow, and Red Cedar nearer the camera. Some of the pine strips come a lot further towards the photographer than they need to, to avoid long sections unsupported by forms. These would be cut back when it came time to add the purpleheart.


Stripping the foredeck over temporary forms hot-glued into the hull

The narrow tapered bow and stern were dealt with somewhat differently – I used a spruce endcap cut neatly to the right section, with holes cut for a PVC tube which was bent while hot (and with thick cord inside to stop it flattening). The tube curved round a carefully cut piece of thick dowel epoxied in place. This whole space would eventually be filled by an end-pour which would hold everything in place, render it waterproof and make the ends quite resistant to damage.

A couple of days after the photos above, I had marked and cut the first curve of the pattern, and started adding the first purpleheart strips.


The first hardwood strips on the foredeck

Stripping was essentially complete five weeks later, during which time I’d also built the aft hatch recess and the recess aft of the cockpit. You can see in these photos that almost all the staples had been removed and quite a lot of the sanding done, too.

From the stern looking forward with stripping almost completed, March 1st From the bow looking aft with stripping almost completed, March 1st Fully stripped and sanded, later the same day

To make rolling easy, it’s important to have the aft of the cockpit coaming as low as possible. I hadn’t built any kind of cockpit recess on Geyrfugl, but thought that an aft recess was essential for this boat. So the cut-out for the cockpit was well oversized aft, and I filled in with transverse strips. Since this part of the deck was all pine, the recess strips were pine, too. Apart from the first strip which took a bit of effort to shape correctly, this went more easily than I expected. The sharp angle at the back of the recess also makes for quite a strong section of deck just aft of the cockpit – since this can take quite a bit of my weight when getting in to the boat, it was important that this bit of deck had minimal flex. Holding these strips in place without forms to staple them to was the only part that a required a bit of ingenuity. As always, snoopy loops proved to be useful here, with the spring clamp holding a stretched snoopy in place to keep the joint with the previous strip nice and tight.

Pine strips building a cockpit recess, February 27th
The rolling recess almost stripped

The large circular hole in the foredeck needed filling next. The forward deck hatch and tiny aft hatch above the skeg would have recesses, and I chose to build the walls of the recesses with African Padauk, a spectacular orange red wood (which also darkens a lot with age) which proved to be easier to work than the purpleheart.

Initial fitting of front hatch recess ply annulus, March 3rd
The front hatch recess with two of the padauk wall strips in place

This would soon look like a bigger version of the aft hatchlet which I’d finished earlier (pretty much as soon as its surrounding deck was stripped).

Aft hatch recess complete, February 13th
Although I had the hatch and its rim sat in place, these would not be glued in until after the deck was glassed

The deck was now sealed with epoxy, then glassed, giving it enough strength for a bit more handling. The first epoxy coat really brought out the deep colour of the hardwoods.


I’d fitted the endcaps on January 16th and started stripping on the 18th. The seal coat was on by March 4th, despite several days out paddling, three days local skiing and a week away downhill skiing. My log suggests 107 hours of work over that period, but a bit of that would be work towards the next stage – the cockpit coaming.

Cormorant hull glassed inside

From laying out the marine plywood on December 20th, the hull has taken three weeks to reach this stage where the inside is glassed and the skeg-box fitted. The outside is not glassed (or even sealed) as this step is not being taken until after the deck is done. Compared with a stripper, this is really fast ! But since the boat is to be a hybrid, and the deck will be stripped, it will be some time yet before she looks like a boat…


Christmas day – keel and stems stitched, holes being drilled along chines

It only took a short time (but required a big work table) to scarf together two sheets of 4 mm marine ply and cut the panels. Stitching was complete within the first week, and the hull could be turned over to glass the inside. I glassed all the part which would be between the two bulkheads in 6 oz (coarse weave) glass, and feathered the edges. I then spent some time building the skeg box, cutting the slot in the keel for it, and fitting it in place. This process was documented on my old website (I’ll incorporate that into the blog soon, which will mean bigger photos than the ones there). I then glassed the ends of the boat with 4 oz satin-weave glass, with a slight overlap where the bulkheads will go, which will add a little strength to the parts which could potentially be more highly stressed by the stiffness of the bulkheads.


Cockpit area glassed in 6oz, ends in 4oz glass

The landmark of having the hull strong enough to be taken outside was reached on January 14th, three weeks into the project. I now hot-glued in forms for the deck, cut to half-ellipse sections – a fatter ellipse forward of the cockpit position and flatter aft, but a constant eccentricity within each part.